Oct 12, 2018 18:56 JST

Source: Mitsubishi Power

Operations Begun at China's Sanmen Nuclear Power Plant Unit 1
- State-of-the-Art Pressurized Water Reactor Plant Utilizes MHPS' Turbine Power Generation Facilities -

- All standards required by China cleared in functional, safety confirmation, and performance tests
- 1,250 MW high-quality turbine generation facilities to contribute to stable energy supplies

YOKOHAMA, Japan, Oct 12, 2018 - (JCN Newswire) - Mitsubishi Hitachi Power Systems, Ltd. (MHPS) announces that the steam turbine generation facilities supplied for the Sanmen nuclear power plant in China have cleared all necessary functional, safety confirmation, and performance tests, with a signing ceremony held on October 11. The turbine generators being used at the nuclear power station are MHPS' mainstay model with a 54-inch last stage blade. These systems have a proven track record at power generation facilities in Japan, and are now being used in full-fledged operations in China for the first time. The Sanmen Nuclear Power Station is the world's first commercial 3rd Generation 1,250 megawatt class pressurized water reactor (AP1000).

Signing Ceremony
 


The Sanmen nuclear power plant was built by Sanmen Nuclear Power Co., Ltd. in Sanmen, Zhejiang Province, south of Shanghai. The facility comprises two units, each with an output of 1,250 megawatts. MHPS provided six low-pressure turbines, two high-pressure turbines, the main valves and other equipment for the two units within the facility. Harbin Electric Corporation handled the turbine casing, heat exchanger, auxiliary equipment and other equipment, while Mitsubishi Electric and Harbin Electric each supplied one of the two generators. The designs for the turbine, heat exchanger, and auxiliary equipment were all provided by MHPS through a technology transfer.

The Sanmen Unit 1 began fuel loading at the end of April 2018, and reached 100% output in mid-August. After clearing performance tests and the 168 hours of continuous demonstrated operation additionally required by the Chinese government, the plant began commercial operation. The power generating unit, as noted previously, is the world's first commercial AP1000. MHPS assigned engineers on a long-term basis to conduct prior verification tests with the nuclear reactor and turbine sides, as well as confirmation tests on site. The meticulous project management and close communication led to a smooth start of commercial operations.
Going forward, MHPS will continue to contribute to resolving the global issues of stable energy supplies, economic development, and reducing the environmental load by providing steam turbines for safe, reliable, and high-quality nuclear power generation facilities.

Contact:
Corporate Communication Department
Mitsubishi Heavy Industries, Ltd.
Email: mediacontact_global@mhi.co.jp
Tel: +81-(0)3-6716-2168
Fax: +81-(0)3-6716-5860
Source: Mitsubishi Power
Sectors: Energy, Alternatives

Copyright ©2024 JCN Newswire. All rights reserved. A division of Japan Corporate News Network.

Related Press Release


Mitsubishi Power Achieves #1 Global Gas Turbine Market Share in 2023
March 15 2024 17:34 JST
 
Mitsubishi Power and Egypt Ministry of Electricity and Renewable Energy Sign Upgrade and Reliability Agreement Extension for Sidi Krir and El-Atf Power Plants
October 31 2023 15:49 JST
 
Mitsubishi Power Hosts First Seminar with Government and Industry Leaders to Explore Technologies for Philippines' Energy Future
September 01 2023 12:37 JST
 
EPC Consortium of Mitsubishi Power, TIC and Sargent & Lundy to Build Entergy Texas' New, Cleaner and More Reliable Power Station
March 03 2023 15:22 JST
 
MHPS Receives Order for Three M701JACs Advanced Air-cooled Turbines for a United Arab Emirates Project
August 24 2020 10:32 JST
 
MHPS Receives Contract for AQCS Equipment for a Chemical Plant in Poland
August 04 2020 14:19 JST
 
MHPS to Change Company Name to "Mitsubishi Power"
July 31 2020 15:02 JST
 
MHPS Captures Global Gas Turbine Market Share Leadership Again
May 20 2020 09:09 JST
 
MHPS Announces New Company Name "Mitsubishi Power"
April 24 2020 12:59 JST
 
MHPS Receives Order from Taiwan Power Company for Steam Turbine Facilities for the Datan Power Plant
April 22 2020 17:18 JST
 
More Press release >>

Latest Press Release


More Latest Release >>