Feb 21, 2020 16:07 JST

Source: Mitsubishi Hitachi Power Systems, Ltd.

MHPS Receives 12 Year Maintenance Service Extension for the BLCP Power Station in Thailand

- Third Long-term Maintenance Contract Concluded with BLCP Power -

- Nine years of effective technical service and support leads to new maintenance agreement

YOKOHAMA, Japan, Feb 21, 2020 - (JCN Newswire) - Mitsubishi Hitachi Power Systems, Ltd. (MHPS), concluded a third long-term maintenance agreement (LTMA) for the BLCP Power Station operated by BLCP Power Limited (BLCP), an independent power producer (IPP) in Thailand. The contract was concluded at a signing ceremony held on February 14. The original LTMA for the power station lasted three years which was followed by a second agreement for six years. MHPS' technical service effectiveness over the nine-year period was highly regarded by the client. As such, BLCP sought continuation of long-term stable operations and improved efficiency which led to the conclusion of a 12-year third LTMA.

Signing Ceremony
 


The signing ceremony, held at the MHPS head office in Yokohama, was attended by BLCP Managing Director Yuthana Charoenwong and other company executives, with MHPS represented by President Ken Kawai. The comprehensive LTMA includes regular inspections, equipment replacement, and efficiency improvements. The extension concludes in 2032, when the 25-year power purchase agreement with the Electricity Authority of Thailand completes. MHPS' strong track record in maintenance and optimization will help ensure a long service life for the power plant.

The BLCP Power Station, located in the Map Ta Phut Industrial Estate in Rayong Province in eastern part of Thailand, is a 1,400 megawatt thermal power generating facility comprising of two power plants for which the handover from MHPS was completed in 2007. The LTMA covers the power plant major equipment including boilers, steam turbines and flue gas cleaning system built by MHPS on a turnkey basis.

MHPS also concentrates on measures to strengthen its service business, such as developing and expanding its operations and maintenance (O&M) service including enhancing efficiency through renewal and renovation of power generating equipment, trouble prevention and reducing CO2 emissions. The conclusion of this LTMA is part of this effort.

MHPS pursues closer cooperation with its customers, by helping them improve the efficiency of generating equipment and facilities, while enhancing profitability for its customers.


About Mitsubishi Hitachi Power Systems, Ltd.
Mitsubishi Hitachi Power Systems, Ltd. (MHPS), headquartered in Yokohama, Japan, is a joint venture formed in February 2014 by Mitsubishi Heavy Industries, Ltd. and Hitachi, Ltd. integrating their operations in thermal power generation systems and other related businesses. MHPS today ranks among the world's leading suppliers of equipment and services to the power generation market, backed by 100 billion yen in capital and approximately 20,000 employees worldwide. The Company's products include GTCC (gas turbine combined-cycle) and IGCC (integrated coal gasification combined-cycle) power plants, gas/coal/oil-fired (steam) power plants, boilers, generators, gas and steam turbines, geothermal power plants, AQCS (air quality control systems), power plant peripheral equipment, digital solutions and solid-oxide fuel cells (SOFC).

For more information, please visit www.mhps.com.


Source: Mitsubishi Hitachi Power Systems, Ltd.
Sectors: Energy

Copyright ©2020 JCN Newswire. All rights reserved. A division of Japan Corporate News Network.

Related Press Release


MHPS to Change Company Name to "Mitsubishi Power"
July 31 2020 15:02 JST
 
MHPS Captures Global Gas Turbine Market Share Leadership Again
May 20 2020 09:09 JST
 
MHPS Announces New Company Name "Mitsubishi Power"
April 24 2020 12:59 JST
 
MHPS Receives Order from Taiwan Power Company for Steam Turbine Facilities for the Datan Power Plant
April 22 2020 17:18 JST
 
MHPS Receives Order from China's Baotou Steel for Two Blast Furnace Gas-fired Gas Turbine Combined Cycle (GTCC) Power Generating Units
April 14 2020 12:48 JST
 
MHPS: Second Commercial-use MEGAMIE System Begins Operations at HAZAMA ANDO Technical Research Institute
April 09 2020 12:09 JST
 
MHPS: World's Most Efficient Power Plant is Synced to the Grid and Operating at Full Load, Ahead of Schedule
April 02 2020 10:05 JST
 
MHPS, MHIENG and MGC Selected to Conduct Research on Effective Recycling of CO2 to Produce Methanol
March 31 2020 14:34 JST
 
MHPS to Introduce MHPS-TOMONI Digital Solutions for Geothermal Power Plant in Mexico
March 25 2020 11:19 JST
 
MHPS: JERA Power Anegasaki Orders Three Cutting-Edge 1,650 deg C MHPS M701JAC-type GTCC Power Generating Facilities
March 18 2020 15:21 JST
 
More Press release >>

Latest Press Release


More Latest Release >>